<div class="content-intro"><div class="page"> <div class="section"> <div class="layoutArea"> <div class="column"> <p><span style="font-family: helvetica, arial, sans-serif; font-size: 12pt;"><strong>About Redwood Materials</strong></span></p> <div> <p><span style="font-family: helvetica, arial, sans-serif;"><strong>Redwood Materials was founded in 2017 by JB Straubel, co-founder and former CTO of Tesla, on a simple but radical idea: the critical minerals powering the energy transition already exist. They just need to come back. Today Redwood is the largest lithium-ion battery recycler in North America — recovering, refining, and redeploying critical minerals from end-of-life batteries back into the supply chain. On the energy side, Redwood has deployed the largest second-life battery project in the world, delivering power to AI data centers in months rather than years using proprietary energy architecture engineered entirely in-house. The company is profitable, the market it operates in is projected to grow 20 to 50 times over the next decade, and Redwood is the only company with the supply chain, the technology, and the operational scale to lead it.</strong></span></p> </div> </div> </div> </div> </div></div><p><span class="TextRun SCXW107758551 BCX4" lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW107758551 BCX4"><strong><span class="TextRun SCXW85275566 BCX4" lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW85275566 BCX4">Position Summary</span></span></strong><span class="EOP Selected SCXW85275566 BCX4" data-ccp-props="{}"> </span></span></span></p> <p><span class="TextRun SCXW107758551 BCX4" lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW107758551 BCX4">The Senior Staff Scheduler will<span class="Apple-converted-space"> </span></span><span class="NormalTextRun SCXW107758551 BCX4">be responsible for</span><span class="NormalTextRun SCXW107758551 BCX4"><span class="Apple-converted-space"> </span>developing,<span class="Apple-converted-space"> </span></span><span class="NormalTextRun SCXW107758551 BCX4">monitoring</span><span class="NormalTextRun SCXW107758551 BCX4">, and<span class="Apple-converted-space"> </span></span><span class="NormalTextRun SCXW107758551 BCX4">maintaining</span><span class="NormalTextRun SCXW107758551 BCX4"><span class="Apple-converted-space"> </span>project schedules to ensure the<span class="Apple-converted-space"> </span></span><span class="NormalTextRun SCXW107758551 BCX4">timely</span><span class="NormalTextRun SCXW107758551 BCX4"><span class="Apple-converted-space"> </span>completion of projects. This role involves coordinating with project teams, stakeholders, and other departments to track project progress,<span class="Apple-converted-space"> </span></span><span class="NormalTextRun SCXW107758551 BCX4">identify</span><span class="NormalTextRun SCXW107758551 BCX4"><span class="Apple-converted-space"> </span>potential delays, and implement solutions to keep projects on track. </span></span><span class="EOP Selected SCXW107758551 BCX4" data-ccp-props="{}"> </span></p> <p><strong><span data-contrast="auto">Responsibilities/Essential Duties will Include:</span></strong><span data-ccp-props="{}"> </span></p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="22" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="1" data-aria-level="1"><span data-contrast="auto">Develop, manage, and update detailed project schedules using Primavera P6</span><span data-ccp-props="{}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="22" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="2" data-aria-level="1"><span data-contrast="auto">Collaborate with project managers, engineers, and other stakeholders to gather project details and ensure accurate schedule development.</span><span data-ccp-props="{}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="22" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="3" data-aria-level="1"><span data-contrast="auto">Monitor project progress and performance to identify potential scheduling issues and recommend corrective actions.</span><span data-ccp-props="{}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="22" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"hybridMultilevel"}" data-aria-posinset="4" data-aria-level="1"><span data-contrast="auto">Prepare periodic schedule reports, including critical path analysis, project forecasts, and status updates for stakeholders.</span><span data-ccp-props="{}"> </span></li> </ul> <ul> &l